Through the sharing of the above content, I believe that everyone has a certain understanding of network cables. Next, the author will share with you the production steps of the crystal head of the seven types of network cables as follows:
Stripping: Use the network cable pliers to lightly cut a circle, peel off the outer cover of the network cable about 2-3cm, cut off the excess shielding layer, pay attention to the strength, and do not damage the insulation of the 8-core wire;
Sorting: There are two specifications for network cable sorting: T568A and T568B. The T568B standard is demonstrated here: orange-white, orange, green-white, blue, blue-white, green, brown-white, brown )
Trimming: After arranging the wire sequence, use network cable pliers to cut the wire ends evenly, leaving about 1.5-2cm for the core wire, so that the crimping crystal head can just press the insulation.
Wire insertion: Put the back of the crystal head up, insert the 8-core wire neatly into the top,
Crimping: a crimping the crystal head - after setting the crimping mode of the network cable pliers, place the crystal head in the notch and press it firmly; b crimping dovetail clip - close the dovetail clip of the seven types of crystal head, and press it with the network cable pliers catch
Test: After the crimping is completed, connect the tester to test the lights, and the 8 cores will light up one by one, indicating that they can be used normally.